翻訳と辞書
Words near each other
・ Belgorod Province
・ Belgorod State University
・ Belgorod-Khar'kov Offensive Operation
・ Belgorodsky
・ Belgorodsky District
・ Belgrade
・ Belgrade (disambiguation)
・ Belgrade (film)
・ Belgrade and St. David's Church
・ Belgrade anti-gay riot
・ Belgrade Armorial II
・ Belgrade Beer Fest
・ Belgrade Blue Dragons
・ Belgrade Book Fair
・ Belgrade Bus Station
Belgrade bypass
・ Belgrade Central Station
・ Belgrade Circle
・ Belgrade City Administration
・ Belgrade City Administration (1929–41)
・ Belgrade City Museum
・ Belgrade Competition in Oratory
・ Belgrade Cooperative
・ Belgrade declaration
・ Belgrade Drama Theatre
・ Belgrade Fair
・ Belgrade Fair – Hall 1
・ Belgrade Football Subassociation
・ Belgrade Forest
・ Belgrade Formation


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Belgrade bypass : ウィキペディア英語版
The Belgrade city road bypass ((セルビア語:Обилазница око Београда / ''Obilaznica oko Beograda'')) or Belgrade bypass, is a bypass road currently under construction around the city of Belgrade, the capital of Serbia.The project is financed from the National Investment Plan, the European Bank for Reconstruction and Development, and the European Investment Bank.(【引用サイトリンク】title=International financing and resettlement aspects of the Belgrade bypass project ) The total project is estimated at €543 million. The bypass was planned by the Belgrade's general urban planning, and its parts have been sporadically built for 17 years. However, the works intensified around the end of 2005.(【引用サイトリンク】title=Kao Skadar na Bojani ) Its construction is expected to help alleviate Belgrade's traffic congestion, and remove all transit traffic from the city center, unloading the critical Gazela and Pančevo Bridges. The total length of the bypass will be 69 kilometres.On January 21, 2012, the Minister of Infrastructure of Serbia Milutin Mrkonjić has said that the Section B of the bypass will be opened for traffic in May 2012, 6 months before scheduled completion.http://www.tanjug.rs/videodet.aspx?galID=53300 Mrkonjić repeated that promise on February 26, 2012.http://www.mondo.rs/s235394/Info/Ekonomija/Obilaznica_oko_Beograda_gotova_u_maju.html==Sections==The bypass will consist of three principal sections:* Section A: Batajnica–Dobanovci, connecting the Belgrade-Novi Sad highway (E75) on the north and Šid–Belgrade highway on the west (E70), 9.7 km long.* Section B: Dobanovci–Bubanj Potok, connecting E70 with the southbound Belgrade-Niš highway (E75), 37.3 km long - partly finished (from Dobanovci to Orlovača)* Section C: Bubanj Potok–Vinča–Starčevo (near Pančevo), 22 km long, crossing the Danube across a new bridge.(【引用サイトリンク】title=Proposed plan for the Belgrade bypass project )Part of Section B from Dobanovci to Orlovača was finished and opened for traffic in October 2008.(【引用サイトリンク】title=Drumski koridor 10 kroz Srbiju ) All heavy trucks were banned on Gazela bridge in March 2010, effectively redirecting all truck transit over the Section B.Section A was opened for traffic in May 2012, along with the Orlovača–Straževica part of the Section B.(【引用サイトリンク】 title=Krenuo saobraćaj obilaznicom oko Beograda ) Batajnica interchange, the origin of section A, is still incomplete, with only one side of the viaduct in operation. Of the section B, the part between Straževica tunnel and Bubanj potok is still under construction, operating as single carriageway.Section B, spanning the hilly terrain, will include 4 tunnels and 40 viaducts when completed, nine of them over 400 m long. In the final stage, it will also require enhancement of the existing Ostružnica bridge to accommodate the planned dual carriageway. Section C is technically the most complex, as its construction involves building a 1,190 m long bridge over the Danube, and additional 11 viaducts and 2 tunnels. Its exact route is not decided yet, and the completion is scheduled by 2017.

The Belgrade city road bypass ((セルビア語:Обилазница око Београда / ''Obilaznica oko Beograda'')) or Belgrade bypass, is a bypass road currently under construction around the city of Belgrade, the capital of Serbia.
The project is financed from the National Investment Plan, the European Bank for Reconstruction and Development, and the European Investment Bank.〔(【引用サイトリンク】title=International financing and resettlement aspects of the Belgrade bypass project )〕 The total project is estimated at 543 million.〔
The bypass was planned by the Belgrade's general urban planning, and its parts have been sporadically built for 17 years. However, the works intensified around the end of 2005.〔(【引用サイトリンク】title=Kao Skadar na Bojani )〕 Its construction is expected to help alleviate Belgrade's traffic congestion, and remove all transit traffic from the city center, unloading the critical Gazela and Pančevo Bridges. The total length of the bypass will be 69 kilometres.
On January 21, 2012, the Minister of Infrastructure of Serbia Milutin Mrkonjić has said that the Section B of the bypass will be opened for traffic in May 2012, 6 months before scheduled completion.〔http://www.tanjug.rs/videodet.aspx?galID=53300〕 Mrkonjić repeated that promise on February 26, 2012.〔http://www.mondo.rs/s235394/Info/Ekonomija/Obilaznica_oko_Beograda_gotova_u_maju.html〕
==Sections==
The bypass will consist of three principal sections:
* Section A: BatajnicaDobanovci, connecting the Belgrade-Novi Sad highway (E75) on the north and Šid–Belgrade highway on the west (E70), 9.7 km long.
* Section B: Dobanovci–Bubanj Potok, connecting E70 with the southbound Belgrade-Niš highway (E75), 37.3 km long - partly finished (from Dobanovci to Orlovača)
* Section C: Bubanj Potok–VinčaStarčevo (near Pančevo), 22 km long, crossing the Danube across a new bridge.〔(【引用サイトリンク】title=Proposed plan for the Belgrade bypass project )
Part of Section B from Dobanovci to Orlovača was finished and opened for traffic in October 2008.〔(【引用サイトリンク】title=Drumski koridor 10 kroz Srbiju )〕 All heavy trucks were banned on Gazela bridge in March 2010, effectively redirecting all truck transit over the Section B.
Section A was opened for traffic in May 2012, along with the Orlovača–Straževica part of the Section B.〔(【引用サイトリンク】 title=Krenuo saobraćaj obilaznicom oko Beograda )〕 Batajnica interchange, the origin of section A, is still incomplete, with only one side of the viaduct in operation. Of the section B, the part between Straževica tunnel and Bubanj potok is still under construction, operating as single carriageway.
Section B, spanning the hilly terrain, will include 4 tunnels and 40 viaducts when completed, nine of them over 400 m long. In the final stage, it will also require enhancement of the existing Ostružnica bridge to accommodate the planned dual carriageway.〔
Section C is technically the most complex, as its construction involves building a 1,190 m long bridge over the Danube, and additional 11 viaducts and 2 tunnels. Its exact route is not decided yet, and the completion is scheduled by 2017.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「The Belgrade city road bypass ((セルビア語:Обилазница око Београда / ''Obilaznica oko Beograda'')) or Belgrade bypass, is a bypass road currently under construction around the city of Belgrade, the capital of Serbia.The project is financed from the National Investment Plan, the European Bank for Reconstruction and Development, and the European Investment Bank.(【引用サイトリンク】title=International financing and resettlement aspects of the Belgrade bypass project ) The total project is estimated at €543 million. The bypass was planned by the Belgrade's general urban planning, and its parts have been sporadically built for 17 years. However, the works intensified around the end of 2005.(【引用サイトリンク】title=Kao Skadar na Bojani ) Its construction is expected to help alleviate Belgrade's traffic congestion, and remove all transit traffic from the city center, unloading the critical Gazela and Pančevo Bridges. The total length of the bypass will be 69 kilometres.On January 21, 2012, the Minister of Infrastructure of Serbia Milutin Mrkonjić has said that the Section B of the bypass will be opened for traffic in May 2012, 6 months before scheduled completion.http://www.tanjug.rs/videodet.aspx?galID=53300 Mrkonjić repeated that promise on February 26, 2012.http://www.mondo.rs/s235394/Info/Ekonomija/Obilaznica_oko_Beograda_gotova_u_maju.html==Sections==The bypass will consist of three principal sections:* Section A: Batajnica–Dobanovci, connecting the Belgrade-Novi Sad highway (E75) on the north and Šid–Belgrade highway on the west (E70), 9.7 km long.* Section B: Dobanovci–Bubanj Potok, connecting E70 with the southbound Belgrade-Niš highway (E75), 37.3 km long - partly finished (from Dobanovci to Orlovača)* Section C: Bubanj Potok–Vinča–Starčevo (near Pančevo), 22 km long, crossing the Danube across a new bridge.(【引用サイトリンク】title=Proposed plan for the Belgrade bypass project )Part of Section B from Dobanovci to Orlovača was finished and opened for traffic in October 2008.(【引用サイトリンク】title=Drumski koridor 10 kroz Srbiju ) All heavy trucks were banned on Gazela bridge in March 2010, effectively redirecting all truck transit over the Section B.Section A was opened for traffic in May 2012, along with the Orlovača–Straževica part of the Section B.(【引用サイトリンク】 title=Krenuo saobraćaj obilaznicom oko Beograda ) Batajnica interchange, the origin of section A, is still incomplete, with only one side of the viaduct in operation. Of the section B, the part between Straževica tunnel and Bubanj potok is still under construction, operating as single carriageway.Section B, spanning the hilly terrain, will include 4 tunnels and 40 viaducts when completed, nine of them over 400 m long. In the final stage, it will also require enhancement of the existing Ostružnica bridge to accommodate the planned dual carriageway. Section C is technically the most complex, as its construction involves building a 1,190 m long bridge over the Danube, and additional 11 viaducts and 2 tunnels. Its exact route is not decided yet, and the completion is scheduled by 2017.」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.